Banner upgrades and new product installs
Scheduled Maintenance Report for CIT Geneseo Status
Completed
The scheduled maintenance has been completed.
Posted May 02, 2019 - 15:14 EDT
Update
All upgrades and new product installs are complete with the exception of the HEDM EVENTS and CDCADMIN optional steps of the Ethos API DB Upgrade 9.11. I encountered errors and have a production ticket open with Ellucian. These steps are required in order for BEP and Ethos to be operational, and are required for GUID generation.
Appworx/jobsub/pipes/aq are up and everything related to Banner is available. Leaving this status open. May need to stop Appworx later today and overall Banner performance will definitely be impacted during GUID generation.
Posted Apr 14, 2019 - 09:32 EDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Apr 14, 2019 - 03:00 EDT
Scheduled
Over the weekend we will be installing Banner products and making database changes to support the CRM Advance system. APM will be down all weekend. I hope to do most of the work that will create outages during the wee hours of the morning. Performance of anything accessing the Banner database could be impacted all weekend.

Appworx down during critical parts of upgrades
APM down
Web Tailor release 8.8.4
Web Tailor patch 8pcr-000163112
Banner Event Publisher database components 2.0.2 and 9.2
Ethos API DB Upgrade 9.11
GUID generation for CRM Advance
Posted Apr 09, 2019 - 14:56 EDT
This scheduled maintenance affected: Administrative Systems (APM Advancement Reporting, AppWorx, Banner) and Academic Services (KnightWeb).